On April 18, the reporter learns from liangjiang new area, liangjiang new area boe 6th generation AMOLED (flexible) production line project, Beijing Oriental wisdom system innovation center, Mr Winters semiconductor loading plate and the system level package printed circuit board upgrade, corning in furnace projects 4 municipal key projects of electronic information industry, in the first quarter of the total investment of 2.14 billion yuan, The investment progress reached 33.1 percent.
As electronic information industry chain leading enterprises, boe two big projects under construction attract attention.
Among them, boe's 6th generation AMOLED(flexible) production line project, located in Shuicheng City, covers an area of about 970,000 square meters. It officially announced mass production on December 28 last year, and is currently promoting the purchase and installation of subsequent equipment.
It is understood that the 6th generation OF BOE AMOLED(flexible) production line is independently designed, developed and built by BOE, using the world's leading active organic electroluminescence AMOLED technology for research and development and production. Its leading technology products and services will be widely used in the next generation of high-end display fields, such as the new generation of flexible smart phones, foldable notebooks and on-board displays, to promote the whole industry to intelligent and digital upgrading.
Boe Wisdom System Innovation Center, located in Lijia Yuelai Wisdom Park, started construction in October 2020. After more than one year of construction, the main structure of the center is being accelerated.
It is expected that by June this year, the project will have completed the construction of five platforms of soft-hardware integration technology development, new materials and equipment transformation, product and service marketing and display, international talent exchange and training, open technology and market cooperation, and will be completed and put into operation within the year.
At that time, the project will focus on smart retail, smart finance, industrial Internet, smart city public services and other fields, accelerate the clustering of the national display and sensor industry chain advantage resources to Chongqing market, realize the organic coupling of the innovation chain, enhance the ability of industrial technology innovation.
The otes Semiconductor sealed loading board and system-level packaged PRINTED circuit board (PCB) upgrade project located in Yufu New City is scheduled to be completed and put into operation in 2024, and equipment procurement and installation are currently underway.
The reporter learned that Otes is Europe's largest and the world's top manufacturer of high-end semiconductor sealing board and high density interconnect printed circuit board. Its products are mainly used in mobile devices, but also widely involved in automotive, aerospace, industrial, medical electronics and chip fields. Chongqing is one of the most important production bases in the world.
Since 2011, Autex has been investing in high technology and innovative technologies in Chongqing. In 2019, Alters announced an investment of around 1 billion euros in a new plant in Chongqing over the next five years to meet the growing global demand for semiconductor sealing plate technology for high-performance computing applications. In March 2021, Otes added approximately eur 200 million for the expansion of the semiconductor sealing plate business in Chongqing.
When the project is completed and fully operational in 2024, Altex will gain a greater market share in mainstream onboard technology.
The furnace project in the front section of Kangning is located in Shushui New Town, and the construction started in August last year. The main steel structure of the main plant has been capped by nodes on December 29, 2021. Currently, the construction of secondary structure, peripheral protective structure, decoration and the procurement and installation of 52 sub-systems of 12 major systems of mechanical and electrical equipment is under way.
It is understood that the former section of Corning furnace project covers a total land area of about 146 mu, with a total construction scale of about 126,000 square meters and a planned investment of more than 1.4 billion DOLLARS.
In the second phase (glass substrate furnace production line project), 4 melt forming production lines of 8.5-generation and above display glass substrate front segment will be built, and in the third phase (Gorilla glass furnace project), 2 cover glass furnace production lines will be built.
It is worth mentioning that gorilla Glass project will provide durable and optically advantageous cover glass for smart phones, tablets, laptops and other mobile devices. At present, corning Gorilla Glass has been used in more than 8 billion equipment of more than 45 well-known brands in the world. After the project is completed and put into operation, it will play an important role in promoting the electronic information industry of Liangjiang New Area and Chongqing to complement the chain, extend the chain and strengthen the chain, and enhance the toughness and competitiveness of the industrial chain and supply chain.





